SUCAT 1, PARAÑAQUE CITY

LOCATION

Address: Sucat 1, Parañaque City

INTERIOR

DESCRIPTION

Disclaimer: True to its eagerness in improving its products, Efficio reserves the right to change unit plans and specification without prior notice and/or approval. Unit plans reflected here are regarded highly for demostration purposes, but should not be considered final. To see final unit updates, consulting you agent is advised.

IDEAL FOR DATA / CALL CENTERS AND BPO’S
FULLY FURNISHED & FULLY EQUIPPED
PLUG & PLAY AND READY FOR IMMEDIATE OCCUPANCY

No of Floors: 2
Total Floor Area: 1,370sqm
Ground Floor Area: 640sqm
2nd Floor Area: 730sqm
Data Center (Network Operations Center):      

  • 22sqm, 10 open bay rack/data cabinet space capacity with raised flooring
  • Building has CAT5e structured cabling
  • All offices and open space areas are fully carpeted.
  • Split Type Air & Mitsubishi VRF Air Conditioning Systems with total Tonnage of more than 70TR.
  • 100% Backup Electrical Power (Genset)
  • Geared for full GBit redundant internet access
  • All office rooms are fully furnished
  • Area entry and exit points are fully covered with CCTV cameras. Recordings can be archived up to 90 days.
  • Every Floor has common Male and Female Restrooms. The main executive room has its own restroom.
  • Dedicated pantry and locker areas.
  • The building water is supplied from Maynilad via a Cistern. Water distribution from the 800 Gallons Fabricated Steel Pressure Tank.

TERMS OF LEASE  :

RENTAL RATE :  Rate /Square 539 plus additional 12 % EVAT less 10 % Wtax
GUARANTEE DEPOSIT AND ADVANCE RENTAL

12months rent ( 9months guarantee deposit and 3 months advance rent) .
Advance rent shall be applied to the first 3 months of the lease term .

Monthly rent is payable in advance every 7th of the month.

INQUIRE

Disclaimer: In its continuing desire to improve the project, Efficio reserves the right to change product features, prices, and terms without prior notice and approval. Floor plans and perspective depicted are for demonstration purposes only and should not be relied upon as final project plans.